Phase 1 400 MW+

·Phase 2 1 GW

·Phase 3 5 GW+

·Positioned for long-term growth

Liberty Power Park

400 MW+ campus

8 data halls. Behind the meter. Power on the site.

Phase 1 400 MW+·Phase 2 1 GW·Phase 3 5 GW+

New York 146 miles. Philadelphia 142. Ashburn 196. Chicago 576.

Site plan L-1.1 of Liberty Power Park, with the eight halls, power plant, and switchyard
Site plan

The campus

  • Phase 1 is 400 MW+
  • 8 data halls
  • Behind the meter
  • Power on the site

The land

  • 84.62-acre data center lot
  • Land control secured
  • 20-inch gas line on the property
  • 230 kV line on the parcel

The place

  • Bradford County, PA
  • County use confirmed
  • No township zoning
  • New York 146 mi · Ashburn 196 mi

Talk to us

Sales@libertypowerpark.com

203-536-6722

libertypowerpark.com/one-pager

Land

Bradford County. The pipe and the wire are not a future study.

Locationdone
Bradford County, PA
Campusdone
Three lots
Landdone
Land control secured
Gasdone
Gas supply secured — 20" pipeline-quality gas on the property
Wiredone
PENELEC 230 kV ROW on the parcel
Countydone
Bradford County letter of 24 June 2026 — use confirmed
Entitlementdated
Air plan approval and county land development in motion. Target fully entitled January 2027.
Zoningdone
No township zoning. One county clock.
Target CODdated
First delivery at DC-01 · 2027

Network

Close enough to matter. Far enough to build.

Training does not care about three milliseconds. Inference, replication, and your control plane do. Distances are great-circle from the parcel. Pings assume a dedicated dual-loop dark-fibre working path — not the public internet, not the longer protection loop.

Round trip from the parcel Out Back
  1. Philadelphia, PA

    142 mi

    2.7 ms

    PJM market centre

  2. New York, NY

    146 mi

    2.8 ms

    Financial + eyeball networks

  3. Ashburn, VA

    196 mi

    3.8 ms

    US-East cloud gravity

  4. Toronto, ON

    198 mi

    3.8 ms

    Canadian peering

  5. Boston, MA

    279 mi

    5.4 ms

    Research + biotech

  6. Chicago, IL

    576 mi

    11.0 ms

    US-Central interconnect

Great-circle miles from the Bradford County parcel. RTT is a dedicated dual-loop dark-fibre working path: SMF propagation (n≈1.47) on a ~1.15× terrestrial route, 5% slack, coherent transponders. The protection loop is diverse and longer — it is not in these pings. Not an SLA.

Data room

Site, power, gas, fibre, and deal documents.

The documents open with an access code alone. Open the data room.

Access is by code — if you don't have one, ask us and we'll send it over.

We record who enters · 7-day access

No code? Ask David.

Start diligence

Diligence materials follow an NDA.

Survey, title, entitlement filings, the county correspondence, and the counterparty shortlists — say what you need and it goes out under a short mutual NDA.

Sales@libertypowerpark.com203-536-6722

David Connolly · Liberty Power Park LLC