Phase 1 400 MW+

·Phase 2 1 GW

·Phase 3 5 GW+

·Positioned for long-term growth

Pre-construction lease

Lease a hall. Power is on the parcel.

Eight equal 40,000 SF bays. 51.5 MW IT each, behind the meter from nine LM2500+G4 machines. Configure a bay here. Terms are by inquiry. Target COD 2027.

Configure a hall

Pick a model, a bay, and a kit.

This is the setup — hall, load, and kit. When you are ready for terms, inquire and David will come back with a number.

Model

Hall

Kit

Floor math

Rubin271 racks · 51.5 MW · ~9,756 SF
Constraintpower · 100% of 51.5 MW · 271/777 slots of 28,000 SF
Vera Rubin NVL72 aisle — liquid rack-scale

Vera Rubin NVL72 aisle — liquid rack-scale · representative visualization

Terms

Inquire for a number.

One 51.5 MW bay · Rubin NVL72 factory. Terms are by inquiry. Send this setup and David will come back with structure.

InquireEmail this setup

What a hall includes

Power, shell, and liquid to the flange.

Campus provides

  • Allocated MW from the 9 × LM2500+G4 combined-cycle block
  • Warm shell: floor, busway, CDU rooms, liquid to the flange
  • Closed-loop dry cooling — zero process water
  • Campus security, gate, and shared yard
  • Option to interconnect surplus; not required to turn the hall on
  • No fuel pass-through — the campus holds the gas

You bring

  • Racks, accelerators, and manifolds past the CDU flange
  • Fit-out, cages, and in-hall network past the campus spine
  • Bring-your-own kit is first-class
  • Operating labor inside the hall

Commercial terms

Ask for a number.

We do not post a wrap. If you have a load and a date, inquire — David will come back with structure.

Talk to us

Tell us how many megawatts and when.

That is the whole first conversation. You do not need to pick a bay or configure anything to start.

Sales@libertypowerpark.com203-536-6722

David Connolly · Liberty Power Park LLC