Pre-construction lease
Lease a hall. Power is on the parcel.
Eight equal 40,000 SF bays. 51.5 MW IT each, behind the meter from nine LM2500+G4 machines. Configure a bay here. Terms are by inquiry. Target COD 2027.
Configure a hall
Pick a model, a bay, and a kit.
This is the setup — hall, load, and kit. When you are ready for terms, inquire and David will come back with a number.
Model
Hall
Kit
Floor math
| Rubin | 271 racks · 51.5 MW · ~9,756 SF |
|---|---|
| Constraint | power · 100% of 51.5 MW · 271/777 slots of 28,000 SF |

Vera Rubin NVL72 aisle — liquid rack-scale · representative visualization
Terms
Inquire for a number.
One 51.5 MW bay · Rubin NVL72 factory. Terms are by inquiry. Send this setup and David will come back with structure.
What a hall includes
Power, shell, and liquid to the flange.
Campus provides
- Allocated MW from the 9 × LM2500+G4 combined-cycle block
- Warm shell: floor, busway, CDU rooms, liquid to the flange
- Closed-loop dry cooling — zero process water
- Campus security, gate, and shared yard
- Option to interconnect surplus; not required to turn the hall on
- No fuel pass-through — the campus holds the gas
You bring
- Racks, accelerators, and manifolds past the CDU flange
- Fit-out, cages, and in-hall network past the campus spine
- Bring-your-own kit is first-class
- Operating labor inside the hall
Commercial terms
Ask for a number.
We do not post a wrap. If you have a load and a date, inquire — David will come back with structure.
Talk to us
Tell us how many megawatts and when.
That is the whole first conversation. You do not need to pick a bay or configure anything to start.