Power demand · 25 MW blocks
50MW
1 of 8 data halls · DC-01

Plate
Conceptual visualization · not for permitting.
The campus
400 MW+
8 data halls. Bradford County, PA.

Photograph: representative. Not this site.
Schematic · L-1.1
The floor plan the halls are built to.
Halls
8 data halls
One campus.
Campus
400 MW+
Bradford County, PA.
Power
On the site
Behind the meter.
Future phases
400 MW+
Later phases are a separate conversation.
Optional · kits
Seeded examples — open a hall to change its kit.
Halls are equal shells. These platforms are samples, not a requirement. Click a hall and tap Platform, Rack density, or Term to try another. Name a megawatt number first; the kit can wait.
Any load, any size
Name the megawatts. The halls follow.
Bays are equal and adjacent, so a larger take is more of the same campus — not a different product.