Campus · eight numbered halls
Click a hall. Walk the inside.
Hover lights the building. Click opens interiors, video, specs, and a term sheet.

The eight bays — tap one to configure it
DC-01
Available
Vera Rubin NVL72
51.5 MW · 40,000 SF
DC-02
Available
GB300 NVL72
51.5 MW · 40,000 SF
DC-03
Available
Helios · MI455X
51.5 MW · 40,000 SF
DC-04
Available
CS-4 Nexus
51.5 MW · 40,000 SF
DC-05
Available
TPU7x Ironwood
51.5 MW · 40,000 SF
DC-06
Available
Trainium3 Teton MAX
51.5 MW · 40,000 SF
DC-07
Available
MTIA 400 / 450
51.5 MW · 40,000 SF
DC-08
Available
Tenant kit
51.5 MW · 40,000 SF
Platform mix
Seeded kit per hall — change it on Configure.
DC-01
NVIDIA Vera Rubin NVL72
51.5 MW · 40,000 SF
DC-02
NVIDIA GB300 Blackwell Ultra NVL72
51.5 MW · 40,000 SF
DC-03
AMD Helios · MI455X
51.5 MW · 40,000 SF
DC-04
Cerebras CS-4 · WSE-3 Turbo
51.5 MW · 40,000 SF
DC-05
Google TPU7x Ironwood
51.5 MW · 40,000 SF
DC-06
AWS Trainium3 Teton MAX
51.5 MW · 40,000 SF
DC-07
Meta MTIA 400 / 450
51.5 MW · 40,000 SF
DC-08
Bring your own equipment
51.5 MW · 40,000 SF
Schematic · L-1.1
The floor plan the halls are built to.
Each hall
40,000 SF
200 × 200 ft · eight equal bays · ~51.5 MW
DC-01
First delivery
Same envelope · 400 kW–1 MW liquid as the density target
Campus
320,000 SF
412 MW nameplate · 8 × ~51.5 MW · BTM
Future phases
The campus is sized for what is built. The land is not.
Ample land for future phases — the site is expandable to 5+ GW. An anchor position in phase one is a position in everything that follows.
Any bay, any size
Want more than one bay? Say the number.
Bays are equal and adjacent by design, so a larger take is a bigger allocation rather than a different conversation. You do not have to choose one to start.