Phase 1 400 MW+

·Phase 2 1 GW

·Phase 3 5 GW+

·Positioned for long-term growth

Power demand · 25 MW blocks

50MW

1 of 8 data halls · DC-01

25 MW
Liberty Power Park campus — eight numbered halls in front, LM2500 plant and switchyard at the rear
Dual-use campusBehind-the-meter power to the halls first — surplus sold into the PJM grid for a stronger, more reliable network.

Plate

Conceptual visualization · not for permitting.

The campus

400 MW+

8 data halls. Bradford County, PA.

Nine LM2500+G4 aeroderivative packages — representative of the machine class

Photograph: representative. Not this site.

Schematic · L-1.1

The floor plan the halls are built to.

Drawing L-1.1 · Rev. R20 · preliminaryNorth ↑ · eight equal 200′ × 200′ halls
200′ evergreen bufferDC-01200′ × 200′DC-02200′ × 200′DC-03200′ × 200′DC-04200′ × 200′DC-05200′ × 200′DC-06200′ × 200′DC-07200′ × 200′DC-08200′ × 200′Power block 400 MW+9 × LM2500+G4230 kVGatePENELEC 230 kV ROW · dual-use path
8 equal halls · 40,000 SF 9 × LM2500+G4 Switchyard / gatePreliminary · not for construction

Halls

8 data halls

One campus.

Campus

400 MW+

Bradford County, PA.

Power

On the site

Behind the meter.

Future phases

400 MW+

Later phases are a separate conversation.

Optional · kits

Seeded examples — open a hall to change its kit.

Halls are equal shells. These platforms are samples, not a requirement. Click a hall and tap Platform, Rack density, or Term to try another. Name a megawatt number first; the kit can wait.

Open the configurator

Any load, any size

Name the megawatts. The halls follow.

Bays are equal and adjacent, so a larger take is more of the same campus — not a different product.

Sales@libertypowerpark.com203-536-6722

David Connolly · Liberty Power Park LLC