Phase 1 400 MW+

·Phase 2 1 GW

·Phase 3 5 GW+

·Positioned for long-term growth

Contact

Tell us how many megawatts and when.

That is the whole first conversation. You do not need to pick a bay, run the configurator, or sign anything to start one — a line of email is enough.

Your setup: Hall DC-01 · Rubin NVL72 factory · one 51.5 MW bay. Change bay

Express interest

How much power, and when.

No NDA to look, no obligation. Name and email are enough.

Your setup

Hall DC-01 · Rubin NVL72 factory · one 51.5 MW bay

This rides with the note.

Goes to Sales@libertypowerpark.com · no obligation

What happens next

  1. 1You send thisTwo typed fields. No NDA to look, no obligation.
  2. 2We ReplyDirectly, usually same day. Not a drip sequence.
  3. 3NDA if you want the roomShort and mutual, and only if you asked for diligence.
  4. 4Term sheetAfter NDA, if the conversation is real. Negotiated — not a posted tariff.

Pricing

We do not post a wrap. Send this form — David will come back with a number for the load and date you named.

Prefer to look first? The campus map has interiors and specs for every bay.