Configure
Buy megawatts. Bring your own chips.
Four steps: pick a business model, size the load, pick a term, and the price answers live. Power and warm shell — 51.5 MW a bay, 412 MW across the campus.
Step 1 · Business model
Step 2 · How much power
51.5MW
1 bay of 8 · DC-01
Step 3 · Term
Term does not change the rate — a longer contract buys certainty of supply, not a discount. It sets how long the 3.0% escalator compounds.
Step 4 · What it costs
Per year · 51.5 MW
$92.7 M
10-year value
$1.1 B
| Power · included, mandatory | $48.7 M / yr487,231 MWh at $100 / MWh · behind the meter |
|---|---|
| Shell · space, cooling, infrastructure | $44.0 M / yr |
| Rate | $1.8M / MW / yrAnchor tier |
| Escalator | 3.0% / yryear 10 lands at $121.0 M |
| Contract value · 10 yr | $1.1 Baverages $2.06M / MW / yr over the term |
Buys allocated megawatts behind the meter plus the liquid-ready warm shell — campus power and closed-loop liquid to the CDU flange. The kit inside is your capital, so what you run in the bay is your business. Indicative planning figures for discussion, not a posted tariff and not an offer.
51.5 MW · 10 yr · step 1
$92.7 M/ yr
Skip the slider
Know your number already? Just tell us.
The configurator is here if it is useful. If you would rather just tell us the megawatts and the date, that is a faster way in.